How long does a website redesign take? The honest answer is that it depends, but that answer is only useful if you know what it depends on. Two businesses can both ask for “a new website” and end up with projects that differ in length by months, simply because one has its content ready and the other is rewriting every page from scratch.
This article explains the factors that set a redesign timeline, gives broad industry-general ranges for common project types, and offers practical ways to keep a project moving. The ranges are general context, not a quote or a promise. Your project’s schedule should come from a written plan based on its actual scope.
The stages of a typical redesign
Most redesigns follow a similar sequence, even when the details vary. Knowing the stages helps you see where time goes.
-
Discovery and planning
Goals, audience, page list, features, and a review of the current site, including which pages bring in traffic and leads.
-
Content gathering
Page text, photos, logos, service details, and any documents that need to appear on the site.
-
Design
Layouts for the homepage and key page types, followed by rounds of feedback and revisions.
-
Build
Turning approved designs into working pages, setting up forms, integrations, and responsive layouts for phones and tablets.
-
Review and testing
Proofreading, form tests, device checks, speed checks, and fixing what comes up.
-
Launch and follow-up
Going live, setting up redirects, confirming tracking, and resolving issues that appear in the first weeks.
The early stages often feel slow because there is little to look at. That is normal. Time spent agreeing on the page list, goals, and features up front usually saves more time later, because fewer things have to be redesigned or rebuilt once the work is underway. A plan that skips discovery tends to rediscover the same questions during the build, when changes cost more effort.
Some stages overlap. Content can be written while design is underway, for example. But each stage depends on decisions made in the one before it, and delays early in the project tend to push everything after them.
The factors that set the timeline
Number of pages
A five-page site and a forty-page site are different projects. Every page needs content, layout, review, and testing. Sites with many similar pages, such as service-area pages, can often use templates, which helps.
Content readiness
This is the factor that most often stretches a schedule. If page text, photos, and service details are ready when the project starts, the build moves steadily. If content is being written as the project goes, the build waits on it.
Design depth
Refreshing colors, fonts, and layouts on an existing structure is quicker than creating a new visual identity and custom page designs from scratch.
Features and integrations
Booking systems, payment forms, CRM connections, member areas, and online stores each add setup and testing time, and sometimes coordination with outside software vendors.
Platform moves
Moving from one platform to another, such as from a hosted builder to WordPress, means migrating content and rebuilding features rather than just restyling them.
Feedback and approvals
The number of people who need to sign off, and how quickly they respond, has a direct effect. One decision-maker is faster than a committee.
Broad ranges by project type
With those factors in mind, here are ranges commonly seen across the web design industry. They describe typical projects in general, not a schedule from Infinite Marketing or any specific provider. Your project could be shorter or longer depending on the factors above.
| Project type | What it usually involves | Commonly seen range (industry-general) |
|---|---|---|
| Homepage or visual refresh | New design on existing pages and structure, limited content changes | A few weeks |
| Small business redesign | New design and layout across a handful of pages, updated content, forms | Commonly around one to three months |
| Larger redesign with SEO preservation | More pages, URL changes, redirect mapping, content restructuring | Commonly two to four months or more |
| Complex rebuild or platform move | Migration to a new platform, large sites, stores, custom features | Often several months, set by scope |
Treat any range you read online, including these, as a rough orientation only. A reliable timeline comes from a written scope that lists pages, features, content responsibilities, and review rounds.
Where redesigns usually slow down
Delays are rarely caused by one big problem. They come from a series of small waits that add up. Watch for these:
- Content arriving late. Clients usually provide page text by default, and writing it takes longer than most people expect. If you need help, copywriting can be arranged as a separate service, but it should be planned from the start.
- Feedback in pieces. Comments that arrive from different people at different times, sometimes contradicting each other, lead to extra revision rounds.
- Scope that grows mid-project. Adding pages or features after design is approved is normal, but each addition moves the finish line.
- Waiting on access. Logins for the domain registrar, hosting account, analytics, and third-party tools are often hard to track down. Gather them early.
- Photography. If you want real photos of your team, location, or work, the shoot has to be scheduled, completed, and edited before pages can be finished.
- Third-party vendors. Booking platforms, payment processors, and industry software sometimes need their own setup or approval steps.
Protecting search visibility adds planning time
If your current site brings in traffic from search, a redesign has to protect it. That work is not visible in the design, but it takes real time.
- Crawling the old site to list every URL that exists.
- Identifying the pages that receive search traffic or links from other sites.
- Mapping each old URL to the right new page and setting up permanent redirects.
- Carrying over page titles, descriptions, and important content where it still fits.
- Checking indexing and errors in Search Console after launch.
Google’s guidance on site moves with URL changes describes the process for preparing redirects and monitoring a move. For larger or more complex sites, our technical SEO services can handle this part alongside the redesign.
How to keep a redesign on schedule
You have more influence over the timeline than you might think. Most of it comes down to preparation and quick decisions.
-
Agree on scope in writing
A written list of pages, features, and responsibilities prevents surprises. Anything outside it becomes a deliberate decision rather than a gradual drift.
-
Start content early
Begin writing page text and gathering photos before design starts, or at the same time. Even rough drafts help the designer plan layouts.
-
Name one decision-maker
Collect feedback internally, resolve disagreements, and send one consolidated set of comments per review round.
-
Set review windows
Agree on how many days each review round takes, and block time on your calendar for it.
-
Gather logins up front
Domain, hosting, analytics, Search Console, social profiles, and any connected tools.
-
Phase the extras
If a feature is nice to have but not essential for launch, consider adding it after the main site is live.
Choosing the right scope for your timeline
If you need something live soon, it can make sense to start smaller. A focused homepage update or visual refresh can improve how the site looks and works while a larger restructure is planned for later. If your site has deeper problems, such as outdated structure, slow performance, or a platform that no longer fits, a fuller redesign is usually the better use of time even if it takes longer.
Our website redesign service offers several levels of scope, from homepage updates to complex rebuilds. Fixed-price packages can be purchased online, and work outside them is quoted in writing. WordPress builds are handled through our WordPress development process. If you are not sure which scope fits, you can contact us to talk it through.
Frequently asked questions
Can a website redesign be done in a week?
A very small update with content ready and few decisions to make can move quickly. A full redesign with new content, design rounds, testing, and redirects rarely fits into a week without cutting corners.
Does my old site stay live during the redesign?
Usually, yes. The new site is built on a staging copy and replaces the old one at launch, so visitors keep seeing your current site until the new one is ready.
What is the single biggest thing I can do to speed it up?
Have your content ready. Page text, photos, and service details that arrive early let design and build move without waiting.
Will a redesign take longer if I switch platforms?
Generally, yes. Moving platforms involves migrating content, rebuilding features, and mapping redirects, which adds work compared with restyling a site on the platform it already uses.
Is the launch date fixed once the project starts?
A good plan sets target dates for each stage, but the final date depends on content, feedback, and scope changes on both sides. Treat timelines as shared targets rather than fixed commitments.